Supervision of the works project for supplying potable water from the central Costa Brava artery to the Riudellots de la Selva and Campllong municipalities

YEAR:
2009

DESCRIPTION:
Complete design and supervision of the project to supply potable water from the central Costa Brava artery to the Riudellots de la Selva and Campllong municipalities via a 250 mm cast iron pipeline. In its route past Campllong, a branch to the municipality's water tank was created while the main pipeline continued to the Riudellots de la Selva water tank.
The objective of the project was to dilute the water produced at each local plant in order to reduce the concentration of fluorine to levels below the Department of Health recommended limits.

Repair of damage caused by the 2006 torrential rains in Girona province

YEAR:
2007

DESCRIPTION:
Technical assistance provided in the supervising of repairs to the damage caused by the 2006 torrential rains in the Girona region. Included restoration work, shoring up the riverbanks, and repair to hydraulic infrastructure.
Developer: Agència Catalana de l'Aigua (Catalan Water Agency)

Adjustments to the Rabós to Sant Quirze de Colera road (Girona)

YEAR:
2006

DESCRIPTION:
Technical assistance provided in the supervising of construction and coordination of the safety and health aspects of the project. The construction consists of improvements and paving of the road from Rabós to Sant Quirze de Colera via a surface triple-treatment. The section is 3,500 meters. The project included construction of specific animal crossings.
Developer: Departament de Política Territorial i Obres Públiques (Catalan Department of Territorial Policy and Public Works)

Repair of damage caused by the October 2005 torrential rains in Girona province

YEAR:
2006

DESCRIPTION:
Technical assistance provided in the supervision of repairs to the damage caused in the Girona province by the 2005 torrential rains in October of that year. Included restoration work, shoring up the riverbanks, and repair to hydraulic infrastructure.
Developer: Agència Catalana de l'Aigua (Catalan Water Agency)