- Comprehensive management of urban development projects
- Construction management for urban development
- Comprehensive management for sports facilities construction
- Materials supply management
Comprehensive management of urban development construction at the Plaça Rafael Vilarrubias and the streets Tarragona (section II) and València in Banyoles
YEAR:
2008
DESCRIPTION:
Construction management of the Plaça Rafael Vilarrubias renovation, and a section of Carrer Tarragona and Carrer València in Banyoles. The construction consists of conditioning the existing services, reconditioning the road and relocating the paved curbs, as well as rebuilding the Plaça Vilarrubias and the green space located across from new housing built by Elerco, S.A.
2008
DESCRIPTION:
Construction management of the Plaça Rafael Vilarrubias renovation, and a section of Carrer Tarragona and Carrer València in Banyoles. The construction consists of conditioning the existing services, reconditioning the road and relocating the paved curbs, as well as rebuilding the Plaça Vilarrubias and the green space located across from new housing built by Elerco, S.A.
Comprehensive management of the road rerouting in the Valldaro campground in Castell-Platja d'Aro campground
YEAR:
2008
DESCRIPTION:
Management of the construction of a roadway that longitudinally crosses the Valldaro campground in Castell-Platja d'Aro and construction of an engineering structure in order to cross the Can Daussà irrigation canal. The roadway has an average width of 9 meters, of which 6 meters are dedicated to the road and the remainder to curbs or green space. The roadway length is 960 meters, extending from the western area of the campground to the connection with highway GI-666. The bridge crossing the Can Daussà irrigation canal has a span of 8 meters.
2008
DESCRIPTION:
Management of the construction of a roadway that longitudinally crosses the Valldaro campground in Castell-Platja d'Aro and construction of an engineering structure in order to cross the Can Daussà irrigation canal. The roadway has an average width of 9 meters, of which 6 meters are dedicated to the road and the remainder to curbs or green space. The roadway length is 960 meters, extending from the western area of the campground to the connection with highway GI-666. The bridge crossing the Can Daussà irrigation canal has a span of 8 meters.
Management of the installation of artificial turf on the Sant Pere Pescador football pitch (Girona)
YEAR:
2007
DESCRIPTION:
Management of the installation of artificial turf on new Sant Pere Pescador football pitch. Total area of the pitch: 6,825 m2 (73,000 sq. ft.) Metric tons of HBM: 1,200 tm. Lighting: four 18-meter lighting towers each with 6 x 2000 W metallic halogen light systems. Irrigation system: 6 area cannons with a coverage radius of 55 m. Drainage: 210 m of 200 x 350 mm perimeter trenching.
2007
DESCRIPTION:
Management of the installation of artificial turf on new Sant Pere Pescador football pitch. Total area of the pitch: 6,825 m2 (73,000 sq. ft.) Metric tons of HBM: 1,200 tm. Lighting: four 18-meter lighting towers each with 6 x 2000 W metallic halogen light systems. Irrigation system: 6 area cannons with a coverage radius of 55 m. Drainage: 210 m of 200 x 350 mm perimeter trenching.

