- Master plans for electrical systems
- Master plans for climate control, ventilation and exhaust, and fire detection and extinguishing systems
- Master plans for natural gas and fuel oil supply systems
- Potable hot water and potable cold water systems
- Telecommunication systems
- Construction planning for the designed systems
- Consulting for system permitting under current regulations
- Consulting for obtaining service permits under current regulations
- Comprehensive system project management
YEAR:
2009
DESCRIPTION:
2009
DESCRIPTION:
Electrical control and protection panels at the Girona's Doctor Josep Trueta university hospital substation
YEAR:
2008
DESCRIPTION:
New electrical control and protection panels project at the Girona's Doctor Josep Trueta university hospital substation. The power rating of the system is 1,200 kW
2008
DESCRIPTION:
New electrical control and protection panels project at the Girona's Doctor Josep Trueta university hospital substation. The power rating of the system is 1,200 kW
Low-voltage system project at a water treatment plant in Port Aventura
YEAR:
2008
DESCRIPTION:
Low voltage electrical system installation project at the Port Aventura (Tarragona) purification plant. The power rating of the system is 630 kW.
2008
DESCRIPTION:
Low voltage electrical system installation project at the Port Aventura (Tarragona) purification plant. The power rating of the system is 630 kW.
YEAR:
2007
DESCRIPTION:
2007
DESCRIPTION:
Public lighting project in Navata
YEAR:
2007
DESCRIPTION:
Project related to required changes in the Navata public lighting system to improve the electrical and lighting systems. Modification to the public lighting system in the Navata city core to comply with current lighting needs, energy savings, and electrical system regulations and ordinances. The replacement and expansion of the lighting was accompanied by changes and adjustments to the electrical panels, lights, wiring and conduit.
Developer: Navata City Council
2007
DESCRIPTION:
Project related to required changes in the Navata public lighting system to improve the electrical and lighting systems. Modification to the public lighting system in the Navata city core to comply with current lighting needs, energy savings, and electrical system regulations and ordinances. The replacement and expansion of the lighting was accompanied by changes and adjustments to the electrical panels, lights, wiring and conduit.