- Roadway infrastructure
- Roadway reconditioning and improvement
- Design of intersections and accesses
- Transportation infrastructure
- Roadway route studies
- Construction of bridges and engineering structures
Traffic circle project at the intersection of Gran Via Pau Casals and Avinguda de la Cuana, in Roses
YEAR:
2009
DESCRIPTION:
Complete construction of a traffic circle at the intersection of Gran Via Pau Casals and Avinguda de la Cuana, in the Roses city core. Construction of a new bridge 43 m long with a 9 m span over which the new traffic circle will be built. The project includes the construction of a new engineering structure, the repositioning of affected services during the work process, burial of the aerial telephone network and medium voltage electrical distribution line, construction of a new network of storm drains, the development and paving of the traffic circle's surroundings, installation and renovation of public lighting, complete signaling at the intersection and installation of metal banisters to protect pedestrians.
Developer: Roses City Council
2009
DESCRIPTION:
Complete construction of a traffic circle at the intersection of Gran Via Pau Casals and Avinguda de la Cuana, in the Roses city core. Construction of a new bridge 43 m long with a 9 m span over which the new traffic circle will be built. The project includes the construction of a new engineering structure, the repositioning of affected services during the work process, burial of the aerial telephone network and medium voltage electrical distribution line, construction of a new network of storm drains, the development and paving of the traffic circle's surroundings, installation and renovation of public lighting, complete signaling at the intersection and installation of metal banisters to protect pedestrians.
Developer: Roses City Council
Construction project of a highway GI-V-5217 underpass beneath the Queralbs rack train route (cog railway)
YEAR:
2008
DESCRIPTION:
Complete construction project of a highway underpass on the Queralbs municipal access highway, under the Núria valley rack train route (cog railway). The project scope covered the removal of the existing level crossing and the construction of an underpass, a reinforced concrete structure 10.5 m wide, 5.25 m high and 420 m long that will be built on the east side of the railway. The structure will be put into its final location by means of a hydraulic power system which permits train traffic during the project implementation. The project also includes a highway GI-V-5217 detour to the north and the construction of a new 400 m stretch of highway to replace an existing section, which shall be reserved for service vehicle access to the Queralbs station platforms.
Developer: Ferrocarrils de la Generalitat de Catalunya
2008
DESCRIPTION:
Complete construction project of a highway underpass on the Queralbs municipal access highway, under the Núria valley rack train route (cog railway). The project scope covered the removal of the existing level crossing and the construction of an underpass, a reinforced concrete structure 10.5 m wide, 5.25 m high and 420 m long that will be built on the east side of the railway. The structure will be put into its final location by means of a hydraulic power system which permits train traffic during the project implementation. The project also includes a highway GI-V-5217 detour to the north and the construction of a new 400 m stretch of highway to replace an existing section, which shall be reserved for service vehicle access to the Queralbs station platforms.
Developer: Ferrocarrils de la Generalitat de Catalunya
Reconditioning of a section of the Madremanya to Sant Martí Vell road
YEAR:
2006
DESCRIPTION:
Complete design of the conditioning of a section of the GI-V-6701 highway from Madremanya to Sant Martí Vell. The project includes the reconditioning of a 650-meter section of the roadway, the construction of a new bridge over the Sant Martí Vell waterway, widening of the road, and the improvement of the highway GI-V-6701 horizontal alignment between the Boscals waterway bridge and the Sant Martí Vell waterway (Girona).
Developer: Diputació de Girona (Girona Province Administration)
2006
DESCRIPTION:
Complete design of the conditioning of a section of the GI-V-6701 highway from Madremanya to Sant Martí Vell. The project includes the reconditioning of a 650-meter section of the roadway, the construction of a new bridge over the Sant Martí Vell waterway, widening of the road, and the improvement of the highway GI-V-6701 horizontal alignment between the Boscals waterway bridge and the Sant Martí Vell waterway (Girona).