ABM Group
  • Wastewater treatment consulting
  • Water consumption audits
  • Regenerated wastewater reutilization systems
  • Graywater and rainwater treatment and reutilization
  • Solar sludge drying
  • Supply of products for water treatment and solar sludge drying

 

Technical study regarding water consumption at the Poblet monastery facilities

YEAR:
2009

DESCRIPTION:
Technical study based on in-the-field measurements to determine the water consumption at the Poblet monastery facilities.
Client: Poblet monastery

Comprehensive consulting for a WWTP installation in a 542-person (maximum occupation) campground

YEAR:
2009

DESCRIPTION:
Design and development of technical aspects of the wastewater treatment plant (WWTP). Equipment supply, construction management and commissioning of the WWTP. Procedures for dump permitting and automatic monitoring submitted to the ACA. Creation of monthly functional monitoring of the WWTP.
Client: Camping Bassegoda, S.A.

Technical consulting and supply of wastewater treatment plant for the Ministry of Defense science center located in Antarctica

YEAR:
2007

DESCRIPTION:
Dimensioning and capacity calculation and supply of a compact WWTP for the Ministry of Defense science station located in Antarctica, containerized for shipment from the Barcelona Airport.
Client: Spain's Ministry of Defense


ABMgroup :: Abm Engineering & consulting - Build Construction management - Ecovat - Asepma Environmental consulting - Irm consulting :: abm@abmgroup.net